Showing posts with label parlor. Show all posts
Showing posts with label parlor. Show all posts

Thursday, August 2, 2012

Wednesday, July 11, 2012

"Last weekend we drank some beers, hung some drywall, played some poker..."

Remember when kids used to say "I hung some drywall" along with a list of other manly activities to joke about being manly? I never really got it back then, but this weekend, Dan and I hung some drywall, and I guess I feel manly for it.

Monday, July 9, 2012

Wall Sconce!

We've been visiting this lighting shop near our house, which I call the Lindt chocolate shop because they have a bowl of delicious Lindt truffles sitting out for customers (yumm).

Sunday, July 1, 2012

Insulation: the end is in sight

 So...we tackled insulation on Friday despite lingering uncertainties as to the type of insulation. We decided to go with fiberglass (as opposed to blown-in cellulose or foam), because it's the easiest and by far the cheapest (maybe not the best reason). You have to be very careful to get all the cracks so that required a lot of measuring and cutting the batting to the right size. You also have to be completely covered (goggles, mask, long sleeves and pants) with fiberglass, which gets really uncomfortable pretty fast. After we put up the insulation, we further covered that with plastic as a vapor barrier. gah. Hope it's ok.

Wednesday, June 27, 2012

Sneak preview

fun times with paint. This is what I've been thinking for the parlour: half royal blue, half white with a chair rail dividing the two. One wall sconce between the two windows with maybe a bookshelf below. The double doors currently closing off the parlour will be removed.


Cart before horse?

Premature (adjective) 
1. occurring, coming, or done too soon.
2. mature or ripe before the proper time.
Currently our parlor looks like this:

Monday, June 25, 2012

Electrical

 We got the go-ahead from the permit people to start wiring on Friday, so we started drilling some holes in the 2x4s that afternoon and continued the next day. The difficulty for this project lies in the arrangement of the 2x4s: normally, the 2x4s are set in so that the skinny side is facing in and electric code dictates running wires through the walls is best practice. Unfortunately, the two interior walls in the parlour have 2x4s laying flat, with the wider side facing in - I can't drill holes in the 2" side, so I had to find a way around that...by going into the basement.


Connected below at a junction box then to main power

Tuesday, June 19, 2012

demo = weekend project?

For our first *big* project, we've decided to tackle the parlour in the front of the house. We bought ourselves a crowbar and bagster and chatted with 3 electricians about rewiring and the city renovation folks for permits and such. We're now thinking of doing the electrical ourselves and decided to start with demo ASAP (Sunday). All the people we've talked to kept saying the demo would take a weekend...but we smugly told ourselves weekend for ordinary folk = 1 day for us.

 So we stuffed our couches outside the parlour doors into the hallway - the thing about old houses is that the doors are so darn small, you can't get modern couches through them.
hoping we get this room done soon so we can use our front door again.