We got new windows! from Gorell! Triple-paned!
Showing posts with label parlor. Show all posts
Showing posts with label parlor. Show all posts
Saturday, October 6, 2012
Thursday, August 2, 2012
Parlour: DONE (practically)!!!
OK, so, since drywalling, much has been accomplished.
Wednesday, July 11, 2012
"Last weekend we drank some beers, hung some drywall, played some poker..."
Remember when kids used to say "I hung some drywall" along with a list of other manly activities to joke about being manly? I never really got it back then, but this weekend, Dan and I hung some drywall, and I guess I feel manly for it.
Monday, July 9, 2012
Wall Sconce!
We've been visiting this lighting shop near our house, which I call the Lindt chocolate shop because they have a bowl of delicious Lindt truffles sitting out for customers (yumm).
Sunday, July 1, 2012
Insulation: the end is in sight
So...we tackled insulation on Friday despite lingering uncertainties as to the
type of insulation. We decided to go with fiberglass (as opposed to blown-in cellulose or foam), because it's the
easiest and by far the cheapest (maybe not the best reason). You have to be very careful to get all the cracks so that required
a lot of measuring and cutting the batting to the right size. You also
have to be completely covered (goggles, mask, long sleeves and pants)
with fiberglass, which gets really uncomfortable pretty fast. After we
put up the insulation, we further covered that with plastic as a vapor
barrier. gah. Hope it's ok.
Wednesday, June 27, 2012
Sneak preview
Cart before horse?
Premature (adjective)
1. occurring, coming, or done too soon.
1. occurring, coming, or done too soon.
2. mature or ripe before the proper time.
Currently our parlor looks like this:
Monday, June 25, 2012
Electrical
We got the go-ahead from the permit people to start wiring on Friday, so
we started drilling some holes in the 2x4s that afternoon and continued
the next day. The difficulty for this project lies in the arrangement
of the 2x4s: normally, the 2x4s are set in so that the skinny side is
facing in and electric code dictates running wires through the walls is
best practice. Unfortunately, the two interior walls in the parlour have
2x4s laying flat, with the wider side facing in - I can't drill holes
in the 2" side, so I had to find a way around that...by going into the
basement.
![]() |
| Connected below at a junction box then to main power |
Tuesday, June 19, 2012
demo = weekend project?
For our first *big* project, we've decided to tackle the parlour in the front of the house. We bought ourselves a crowbar and bagster and chatted with 3 electricians about rewiring and the city renovation folks for permits and such. We're now thinking of doing the electrical ourselves and decided to start with demo ASAP (Sunday). All the people we've talked to kept saying the demo would take a weekend...but we smugly told ourselves weekend for ordinary folk = 1 day for us.
So we stuffed our couches outside the parlour doors into the hallway - the thing about old houses is that the doors are so darn small, you can't get modern couches through them.
So we stuffed our couches outside the parlour doors into the hallway - the thing about old houses is that the doors are so darn small, you can't get modern couches through them.
| hoping we get this room done soon so we can use our front door again. |
Subscribe to:
Posts (Atom)

